RM Solar S Class 20 Pro Instrukcja Obsługi

Przeglądaj online lub pobierz Instrukcja Obsługi dla Nie RM Solar S Class 20 Pro. RM Solar S Class 20 Pro Instruction manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - Instruction Manual

Instruction ManualIssue 4Note: These Instructions Should Be Read Carefully Before Install, And Before Calling Technical Support.

Strona 2 - Table Of Contents:

9Section 3 - On Roof FramesRoof Space RequiredThis is the roof space approximately required to install the panels on roof in millimeters.8320936010400

Strona 3 - Pre Installation

10Section 3 - Sharks Fin InstallationOn Roof Sharks FinBefore attempting to t your equipment on the roof please ensure that you have all the equipmen

Strona 4 - S Class 10 Specication

11Section 3 - Sharks Fin Installation1110111141714131515The instructions show the installation of a 3 panel kit, be sure to only make the connections,

Strona 5 - S Class 20 Specication

12Section 3 - Sharks Fin InstallationExploded View3 Panel On Roof Tile Frame(Comprising 2 Panel Frame and 1 Extension)1212226789515310103

Strona 6 - S Class 20 Pro Specication

13Section 3 - Sharks Fin Installationca. 1040 mmca.1040 mm1780 - 1980 mmSearch for the rafters at the position of the collector eld. Push up or remov

Strona 7 - Positioning the Panels

14Section 3 - Sharks Fin Installation69987Screw the align screw [9] in the centre hole of the shark bracket. Now use the U-Bolt Bracket [6], washer [7

Strona 8 - Piping Schematics For Panels

15Section 3 - Sharks Fin Installation101510510155Use screw kit M6 x 16 [15] to connect L-Rails [10] to the Sharks Fin. The end with the most predrille

Strona 9 - On Roof Frames

16Section 3 - Sharks Fin InstallationABmax. 500 mm13151111ABC1516121215161211Screw the Z-Rail [11] [12] to the L-Rail [10] using two screws M6 and two

Strona 10 - Roof Space Required

17Section 3 - Sharks Fin InstallationPlace the panels in the correct position. In case of systems with more than two panels, mount the panels starting

Strona 11 - On Roof Sharks Fin

18Section 3 - Slate Bolt InstallationOn Roof Slate BoltBefore attempting to t your equipment on the roof please ensure that you have all the equipmen

Strona 12

1ContentsTable Of Contents:Introduction - Page 2 Health & Safety Information - Page 2Post Installation - Page 2Section 1

Strona 13 - Exploded View

19337867725Section 3 - Slate Bolt InstallationThe instructions show the installation of a 3 panel kit, be sure to only make the connections, and holes

Strona 14 - 1780 - 1980 mm

2044215Section 3 - Slate Bolt InstallationExploded View3 Panel On Roof Tile Frame(Comprising 2 Panel Frame and 1 Extension)

Strona 15 - 500mm Max

21ca. 1040 mmca. 1040 mm1700 - 1870 mm(*700 - 870 mm)Locate the rafters under the slates. Mark the slates where the holes should be drilled so that th

Strona 16

22Section 3 - Slate Bolt InstallationDrill the holes on each marked position with a high quality 25mm masonry bit. Make sure the drill does not spin t

Strona 17

23Section 3 - Slate Bolt InstallationUse the bolt kit M10 to connect the L-Rails to the self sealing bolt tting. Note: The L-Rails must be mounted in

Strona 18

24Section 3 - Slate Bolt InstallationABmax. 500 mm573433447878The Z-Rails have to be screwed on to the L-Rails using the M6 screws. Maximum distance f

Strona 19 - On Roof Slate Bolt

25Section 3 - A Frame InstallationBefore attempting to t your equipment on the roof please ensure that you have all the equipment required to complet

Strona 20

26Section 3 - A Frame InstallationExploded View3 Panel On Roof Tile Frame(Comprising 2 Panel Frame and 1 Extension)132565944791013127106989

Strona 21

27Section 3 - A Frame InstallationTo protect the panels from getting affected by strong winds they have to be screwed tightly to the rood structure. I

Strona 22

28Section 3 - A Frame InstallationScrew the rails 1, 2, and 3 together using 6mm screws (9). The bottom rail has holes for ground or roof xing. The h

Strona 23

2Introduction, Health & Safety, & Post InstallationIntroductionThis installation manual contains essential information for the effective and s

Strona 24 - 1.3m to 1.8 Max

29Section 3 - A Frame InstallationMount the Z prole, the distance between the last triangle and the end of the Z rail must not be more than 500mm. Pa

Strona 25

30Section 3 - A Frame InstallationDrill holes 8.5mm on the appropriate place of the back rails. Use the cross rail (D) as a template. Attach cross rai

Strona 26 - A Frame Installation

31Section 3 - A Frame InstallationMount the panels starting in the middle, mount the wind clamp (8) using screw (9) to the top and bottom of the panel

Strona 27

32Section 3 - A Frame InstallationProceed with the next panel. Place extension kit on connection before you place the panel. Make the panel connection

Strona 28

33Section 3 - Slate Bolt InstallationPlace the panels in the correct position. In case of systems with more than two panels, mount the panels starting

Strona 29

34Section 4 - In Roof Frame InstallationIn Roof Frames - S Class 20The In roof frames from RM Solar come in the following two styles, choosing the cor

Strona 30

35Section 4 - In Roof Frame InstallationPreparationThe following is the area space required by a set of in roof panels, please ensure you have this ar

Strona 31

36Section 4 - In Roof Frame Installation12327723262525222226232323481012101191688891523242021232788825252626232356891010131415231523111718242419202021

Strona 32

37Section 4 - In Roof Frame InstallationImportantWhen unpacking the in-roof frame package please check if any pieces are missing using the list below.

Strona 33

38Section 4 - In Roof Frame InstallationInstallationRemove the tiles / slates required for installation:2 Panel Flashing Set = 260 x 260110cm for ever

Strona 34

3 Section 1 - Product SpecicationsS Class 10 SpecicationRM Solar’s new S Class 10 panel comes in a variety of arrangements, including standard verti

Strona 35 - In Roof Frames - S Class 20

39Section 4 - In Roof Frame InstallationMount Angle BracketsMount angle brackets (1) in equal distance with each 4 screws 4x30 (23) to the support bat

Strona 36

40Section 4 - In Roof Frame InstallationMounting Lower FlashingsStarting from left side, screw lower left ashing (3) at left end to lower slat (2) wi

Strona 37

41Section 4 - In Roof Frame InstallationMounting Upper Wooden WedgeThe upper wooden wedge (no in set incl.) has to be mounted so that the distance bet

Strona 38

42Section 4 - In Roof Frame InstallationPlace and Align CollectorsDistance A = 10cm, Distance B = 10cmPlace 2 high load support brackets (8) under eac

Strona 39 - A = 8,5 - 12 cm

43Section 4 - In Roof Frame InstallationMounting Top Angled Timber WedgePlace top timber wedge (9) under each collector, align them and secure each wi

Strona 40 - B = 0,5 cm

44Section 4 - In Roof Frame InstallationStick Side Seal Strip To CollectorStick side seal strip to the collector sides as shown. You should when apply

Strona 41

45Section 4 - In Roof Frame InstallationMount Center FlashingsPlace center ashing (11) on the lower collector edge and snap in starting from the bott

Strona 42

46Section 4 - In Roof Frame InstallationMount Side FlashingsPush the side ashing (12/13) from the side over the collector edge. Use sealing screws (2

Strona 43

47Section 4 - In Roof Frame InstallationPlace Top Seal StripStick top seal strip (14) across the total length.14

Strona 44

48Section 4 - In Roof Frame InstallationWind Protection RailPlace wind protection rail (15) and x with wood screws 4x30 (23) each 4 times. Note that

Strona 45

4Section 1 - Product SpecicationsS Class 20 SpecicationRM Solar S Class 20 solar panel is a vertically mounted glazed collector with collectionpipes

Strona 46

49Section 4 - In Roof Frame InstallationTop FlashingsStarting from the left side. Push top corner ashing (16) under the wind protection rail (15), wh

Strona 47

50Section 4 - In Roof Frame InstallationNail StrapsFix top ashings (16/17/18/19) with 2 nail strips and side ashing (12/13) with 4 nail strips (20)

Strona 48 - Place Top Seal Strip

51Section 4 - In Roof Frame InstallationPlace TilesIf necessary, cut tiles to make them t. Please use the diagram as a guide as to where to tile up t

Strona 49

52Section 4 - In Roof Frame InstallationIn Roof Frames - S Class 10The In roof frames from RM Solar for the S Class 10 Panel only come in one style wh

Strona 50 - Leading Edge

53Section 4 - In Roof Frame InstallationPreparationThe following is the area space required by a set of in roof panels, please ensure you have this ar

Strona 51

54Section 4 - In Roof Frame InstallationImportantWhen unpacking the in-roof frame package please check if any pieces are missing using the list below.

Strona 52 - Place Tiles

55Section 4 - In Roof Frame InstallationInstallationRemove the tiles / slates required for installation:2 Panel Flashing Set = 270 x 270110cm for ever

Strona 53 - In Roof Frames - S Class 10

56Section 4 - In Roof Frame InstallationSecure BattensAttach 2 battens using (4.5x80 - not supplied) 450mm and 350mm from the top of the batten beneat

Strona 54

57Section 4 - In Roof Frame InstallationMounting The FlashingsStarting from the left hand side, place the left hand apron ashing onto the top batton

Strona 55

58Section 4 - In Roof Frame InstallationMounting The FlashingsConnect the right hand apron ashing to the left hand apron ashing as illustrated (belo

Strona 56

5Section 1 - Product SpecicationsS Class 20 Pro SpecicationThe RM Solar S-Class Pro Panel has been specically designed to meet the needs of large i

Strona 57 - Secure Battens

59Section 4 - In Roof Frame InstallationMounting The FlashingsNote: If the system is larger than 1 panel then the apron from the extension kit is plac

Strona 58

60Section 4 - In Roof Frame InstallationMounting The FlashingsSlide the colour coded ashings over the galvanized section of the apron, start with the

Strona 59 - Mounting The Flashings

61Section 4 - In Roof Frame InstallationMounting The FlashingsThese pieces also interlock.

Strona 60

62Section 4 - In Roof Frame InstallationMounting The FlashingsWhen interlocking correctly the colour coded cover ashing will butt up to the galvanize

Strona 61

63Section 4 - In Roof Frame InstallationMounting The FlashingsNow insert the rest of the xing screws into the galvanized xing plates. (approx 100mm

Strona 62 - These pieces also interlock

64Section 4 - In Roof Frame InstallationMounting The FlashingsInsert the pipe reinforcers (supplied in the install and extension kits) into the panel

Strona 63

65Section 4 - In Roof Frame InstallationMounting The FlashingsAt this point measure diagonally across the panels. The two measurements should be the s

Strona 64

66Section 4 - In Roof Frame InstallationMounting The FlashingsThe panels can now be piped up and the pipework inserted through the roof felt.The panel

Strona 65

67Section 4 - In Roof Frame InstallationMounting The FlashingsFor every panel there will be 1 x wedge shaped wooden section, this needs to be mounted

Strona 66

68Section 4 - In Roof Frame InstallationMounting The FlashingsStick the weather seal (supplied on a roll) to the colour coded apron ashing at both co

Strona 67

6Section 2 - Panel PositioningPositioning the PanelsSouth Facing RoofsPositioning the collectors is important for optimum performance. Collectors shou

Strona 68

69Mounting The FlashingsMount the left hand side ashings starting with the bottom screw, use 1 x small self tapping seal screw (4.5x35mm) at the bott

Strona 69

70Mounting The FlashingsStick the square seal along the top of the panels also over the face of the side and middle vertical ashings.Section 4 - In R

Strona 70

71Mounting The FlashingsScrew the wind retaining rails into place, the angel should run parallel with the edge of the wooden wedge and should lap over

Strona 71 - ashings

72Mounting The FlashingsStarting at the left hand side mount the top ashing ensuring that the leading edge hooks under the wind retaining rail. When

Strona 72

73Mounting The FlashingsThe top ashings interlock in the same way the apron ashings interlock, continue from left to right.The clips and galvanized

Strona 73

74Section 4 - In Roof Frame InstallationMounting The FlashingsStick the triangular seal along the top of the top ashings and down each side by at lea

Strona 74

75Section 4 - In Roof Frame InstallationMounting The FlashingsA small seal screw (4.5x35mm) is used to secure the four corners of the ashings in plac

Strona 75

76Section 4 - In Roof Frame InstallationMounting The FlashingsThe roof covering can now be installed at least to the ridge on the side ashings and to

Strona 76

77Once you have made the connections in accordance with page 7 be sure to seal and pressure test to at least 1 and a half times the proposed working p

Strona 77

78The double pump station ensures a continuous circulation of the glycol inside the closed solar loop when useful energy is available in the solar pan

Strona 78 - Insulation

7Section 2 - Piping CongurationsPiping Schematics For PanelsTypical S Class 10 (Parallel) (Maximum 10 Panels Per Bank)Typical S Class 20 (Series) (Ma

Strona 79 - Double Pump Station

79The expansion vessel protects the solar system during pressure changes and temperature uctuations. For example, in very hot conditions when energy

Strona 80 - Expansion Vessel

80This guide assumes the use of an RM Solar Filling Pump, no other methods are supported by RM Solar as they can often lead to excess air in the syste

Strona 81 - Filling The System

81RM Solar provide the original instruction book from the manufacturer for each of the solar controllers supplied, however provided are the recommende

Strona 82 - Control Setup

82Section 7 - Controller SetupP1T1COMT2N L ALAL1 2 3 4 5 6 7 8 9 10162 3 4 5 6 7 8 9 10Br Bl G O GyL N E 1 C 2 EL N E411 526 35 3Solar ControllerSolar

Strona 83 - Wiring Diagram

83Section 7 - Controller Setup1 2 3 4 5 6 7 8 9 10112 3 4 5 6 7 8 9 10Br Bl G O Gy Br Bl G O GyL N E L N E 1 C 2 E2015 16 1712 13 141 2 3 4 5 6S1 S2 S

Strona 84

84Section 8 - Commissioning & MaintenanceThe following steps are important when ensuring the system has been installed correctly and has been setu

Strona 85 - Commissioning

85Product GuaranteeRM Solar Products are guaranteed by RM Solar Ltd as follows:Thermal Solar Panels (Performance) - S Class 20 Only 20 YearsThermal So

Strona 86 - Maintenance

86SERVICE 1DATE:SERVICE 2DATE:ENGINEER NAME: ENGINEER NAME:COMPANY NAME: COMPANY NAME:TEL NO. TEL NO.COMMENTS: COMMENTS:SIGNATURE: SIGNATURE:SERVICE 3

Strona 88

8Section 3 - On Roof FramesOn Roof FramesThe on roof frames from RM Solar come in the following two styles, choosing the correct frame for your instal

Komentarze do niniejszej Instrukcji

Brak uwag